0%

Design, Build · Own · Operate · Maintain

90 MMSCFD Stranded Gas to Pipeline via compression

Article cover image

Scroll

Author portrait

BE Energy

August 12, 2025

Overview

Engineering, procurement, construction, commissioning and long-term operation of a modular surface boosting station in Algeria's Berkine Basin, compressing and pumping declining-pressure well production (5 bar suction to 88 bar discharge) to the CPF via existing flow lines. Included three-phase separation, regulatory fiscal metering, gas compression and liquid shipping trains with full redundancy, flare and closed drain systems, utilities, fire and gas protection, and ARH-compliant certification dossiers.

The Energy Transition Is Built, Not Declared.

The Energy Transition Is Built, Not Declared.

Get in touch